Organization Profile
Our HangZhou EPTEPT Baihong EPTry Equipment Co., Ltd is a huge company for Pyrolysis Products for 22 many years in China. We located at HangZhou—–a beautiful and Sector deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ed city.We estabEPTd in yr 1997, our main products are setting pyroloysis products.The organization has passed ISO9001 certification, CE certification and SGS worldwide 3rd get together certification.To the general design, manufacturing and producing, installation and commissioning, specialized instruction, soon after-product sales support in the EPT EPT chain procedure of high-tech EPTrprises.
Product details
1. The pyrolysis furnace adopts the construction of heat storage entire body to fully recycle squander heat, which can not only extend the support existence of the major furnace, but also save gas.Therefore more preserving productioncosts.
2. the furnace adopts EPT substantial temperature resistant boiler steel, services daily life up to eight many years.
three. The tools is equipped with infrared blocking avoidance and warning dredging gadget, which can give early warning of pipe blockage in the production process and automatically resolve the blockage issue, so as to guarantee that the principal furnace will not have protection problems owing to pipe blockage in the generation process.
four. The slag discharging technique adopts a dual-cycle structure to management the slag discharging time at about thirty minutes.Slag swiftly cleanse.
No | Specification | Batch kind waste tyre/plastic/rubber pyrolysis EPT | |||
1 | Product | BH-B5 | BH-B8 | BH-B10 | BH-B12 |
two | Doing work way | Batch type | Batch type | Batch type | Batch sort |
3 | Raw material | Waste tyre,squander plastic,squander rubber | |||
four | 24 hour managing ability | 5T | 8T | 10T | 12T |
five | 24 hour oil production | two.4T | 4T | 4.4T | 4.8T |
six | Heating way | Right heating | Immediately heating | Straight heating | Straight heating |
7 | Working strain | Regular force | Common strain | Regular pressure | Ordinary stress |
8 | Cooling way | Water cooling | H2o cooling | Drinking water cooling | Drinking water cooling |
nine | Water intake | 4T/H | 6T/H | 7T/H | 8T/H |
ten | Nosie | le85DB(A) | le85DB(A) | le85DB(A) | le85DB(A) |
11 | Whole bodyweight | 20T | 26T | 27T | 28T |
12 | Location( coiled tube sort) |
twenty*ten*5M | twenty*10*5M | 22*10*5M | twenty five*15*5.5M |
13 | Region(tank variety) | 27*fifteen*5M | 27*fifteen*5M | 29*15*5 | 30*15*5.five |
one. The Raw Materials For Pyrolysis EPT
2. Conclude solution percentage and useage
NO. |
Identify |
Percentage |
Use |
1 |
Tyre oil |
45% |
* can be bought immediately. |
2 |
Carbon black |
thirty% |
* can be marketed right. |
three |
Metal wire |
fifteen% |
* can be sold right. |
four |
Oil gasoline |
ten% |
* can be as gas burn up by use gasoline burn off method |
3. The available gas for pyrolysis processing
NO. |
Gas |
one |
Oil(fuel oil, tyre oil, large oil etc..) |
2 |
Normal gas |
three |
Coal |
four |
Firewood |
five |
Carbon black pellet |
Particulars Images
Our Positive aspects
1. Safety:
a. Adopting automatic submerged-arc welding technological innovation
b. All of the welding will be detected by the ultrasonic nondestructive testing approach to make sure the welding quality and the
welding condition.
c. Adopting manufacture approach managing system on the good quality, every single manufacture approach, manufacture date, and so forth.
d.Outfitted with anti-explosion unit, safety valves, unexpected emergency valves, pressure and temperature meters, as properly as the alarming program.
two. Environmental-helpful:
a. Emission StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd: Adopting EPT gasoline scrubbers to take away acid fuel and dust from smoke
b.Smell in the course of procedure: Entirely enclosed in the course of the procedure
c.H2o air pollution: No air pollution at all.
d. Sound air pollution: the solid right after pyrolysis is the crude carbon black and steel wires which can be deep-processed or marketed immediately with its price.
Why Choose Us
Our services
1.High quality warranty period: A single calendar year warranty for the principal reactor
of pyrolysis EPTs and life time routine maintenance for comprehensive set of EPTs.
two.Our firm sends engineers for set up and commissioning in buyer’s web site incXiHu (West Lake) Dis.Hu (West Lake) Dis. the training of expertise of buyer’s
staff on operation, maintenance, etc.
three. Source layout according to buyer’s workshop and land, civil performs details, procedure manuals, etc. to the consumer.
4. For the harm triggered by the users, our company gives the components and equipment with cost cost.
5. Our factory materials the putting on areas with the price price to clients.